Adani
Stock Price    BSE   NSE
 
 
Home | Port Operations | Port Tariff

Port Tariff

 

Berthing policy and tariff structure updated on 1st October 2011

 
1. PORT DUES

Rs. 7.00 Per GRT of Vessel Minimum Charges Rs. 50000/-per vessel is applicable. > (Port dues applicable per call and maximum validity is 30 days )

2. PILOTAGE CHARGES PER GRT OF VESSEL

Rs.18.20/- For GRT less

than 10,000.

 

Rs. 22.90/- for GRT 10,000/-and above.

MINIMUM RS. 50000/­  VESSEL UP TO 3000 GRT 
MINIMUM RS.175000/­  VESSEL FROM 3001 -15000 GRT 
MINIMUM RS. 375000/­  VESSEL FROM 15001 - 60000 GRT 
Includes one Berthing and one Un-berthing. 

3. PILOT ATTENDANCE CHARGES

Pilot AttendanceCharges

Rs 4500/- per hr

When a pilot is required to stay on board the vessel

on request of the Master or when the port decides to

post a pilot for safety of the vessel/port

4. BERTH HIRE CHARGES

  Rs.0.30 per GRT per Hour 

(First line ashore to all cast off)

   Minimum Charges Rs.25000/- per Day is applicable. 

5. ANCHORAGE CHARGES

Rs.1.20 per GRT per Day 

[A]. Anchorage charges applicable for vessels receiving bunker or carrying out any other operation (as decided by MPSEZL) at anchorage, but not applicable for vessels waiting for MPSEZL berths.

[B]. If a vessel arrives at Mundra Port and inspite of an availability of a Berth, the Master opts not to berth the vessel for any reason (i.e. Option of Owner/Master/Charter/

Agent/Shipper/Receiver), then Anchorage charges as per Port Tariff is applicable.[C] If a vessel is detained for want of port clearance & waiting at anchorage. [D] If a vessel is anchored at anchorage at owners / agents option.[E] If IWPM is not filed on arrival of the vessel.

6. SHIFTING / WARPING PER GRT OF VESSEL

SHIFTING CHARGES 

Rs.18.20/- For GRT less than 10,000. & Rs. 22.90/-

for GRT 10,000/- and above

 

 

.

Minimum Pilotage Charges  is applicable. 
WARPING CHARGES  Rs. 9.00 per GRT for vessel GRT less than 10000 and Rs 11.45/ GRT for vessl GRT 10000 and above  

7. BERTHING PROCESS CHARGES

PILOTAGE CANCELLATION CHARGES  Rs.27000/-   If cancelled between 1.00 hrs till pilot boarding 
Rs.70000/-   If cancelled after pilot boarding 
PILOTAGE DETENTION CHARGES  NIL   First 30 minutes delay from the nominated pilot boarding time  
Rs.90000/-   Per 30 minutes slab and applicable when delay is more than 30 minutes. 

8. UN-BERTHING PROCESS CHARGES

PILOTAGE CANCELLATION CHARGES  Rs.27000/-  If cancelled between 1.00 hrs till Pilot boarding 
Rs.70000/-  If cancelled after boarding 
PILOTAGE DETENTION CHARGES  Rs.27000/-  For first 30 minutes delay from pilot boarding time 
Rs.90000/-  For subsequent delays on a slab of 30 minutes. 

9. VESSEL DEFICIENCIES

 

Unsafe pilot ladder boarding/disembarking arrangements

 

Fine of Rs 25,000/- will be levied for each such occurrence.

In case of unsafe pilot boarding / disembarking arrangements, poorly maintained pilot ladder or inability to rig combination ladder when freeboard of vessel is greater than 9 meters.

Non functional critical navigation equipment which affects safe berthing/ unberthing.

 

Charges of Rs 15000/- per movement for use of electronic navigational equipment (Harbour Pilot)

Vessels with non functional critical navigational equipment such as GPS, GYRO, Radar, will only be berthed using ports Harbour Pilot equipment.

Failure to report critical equipment deficiency in advance.

 

Penalty of Rs 10,000/-

Berthing/Unberthing of vessel liable to be cancelled if in ports opinion same is considered unsafe.

10. TUG HIRE CHARGES

TRANSPORTATION FOR PASSANGERS ONLY      (PER TRIP)   RS.100000/-  For maximum 4 hours and Rs.25000/- for every subsequent hour thereafter. If used by two different parties then each party to pay the said charges. (Not more than 15 persons at a time) Applicable for carrying personnel only.  
 RS.75000/-  In addition to tug hire charges in case the ship's stores are carried in excess of quantity 50 kgs.( Not more than 1.5 Mt at one time ) 

11. COLD MOVE CHARGES

   1

Planned cold move for a berthing vessel will be carried out only with prior approval of the

concerned agency. However, no prior approval will be necessary for the cold move of a vessel

which is already at the berth. Port decision to vacate the berth ( to accommodate any waiting

vessel) will be final. Charges for each process of berthing / un-berthing/ shifting will be 5 times

the Pilotage charges (subject to minimum clause as per point no. 1.2). Cold move charges will be

in addition to the Pilotage charges.

   2 All Tug used for cold move will be charged on hourly basis as per port tariff.
  3  Whenever the engine fails during berthing / un-berthing / shifting / warping, (Irrespective of the fact whether movement is on vessel/Agent or port account) the same will be treated as a cold move & will be charged to the vessel/agent at twice the normal pilotage charges (subject to minimum clause as per point No. 1.2). Additional tugs used for the movement will be as per port tariff on an hourly basis. This will be in addition to the pilotage charges.

12. ADDITIONAL CHARGES AS PER REQUIREMENT:

1

Immobilization permission will be granted at port s discretion. An immobilization

charge of Rs.30000/-for the first 24 hrs is payable, and thereafter at the rate of

Rs.15,000/- per 12 hours slab. Failure to take prior approval will result in penal charges as per para 1.19.9.

2

For vessels entering Mundra port limits & not using the berth facilities the following

charges shall apply.

 

a) Port dues at Rs.7 per GRT ( subject to minimum clause as per point No.1 of

Port Tariff)

 

b) Anchorage charges at Rs.1.20 per GRT per Day.

13. ADDITIONAL TUG HIRE CHARGES

Rs 40000/- per Hour per Tug  Tug hire charges for any activity (berthing / un-berthing / shifting / warping / tug assistance at berth) other than personnel transfer.  

14. OIL SPILL CONTAINEMENT CHARGES

 

Rs. 20,000,00/-

 

Per Day

 

Includes Mob/Demob charges of oil spill containment resources

and collection.

 

Storage and Disposal charges as per actual (case to case basis)

15. TARIFF FOR BOLLARD PULL TEST

1. Bollard Pull 

Rs 40,000/- per 4 hrs slab.

16. TARIFF FOR DIVING OPERATIONS

1

Alongside

Rs. 1,25,000/- for 4 hrs with DSV Dolphin 11 in attendance

 

2

Anchorage

Rs. 2,50,000/- for 4 hrs with DSV Dolphin 11 (Diving will only be done during slack  tide)

 

3

Videography Charges 

Rs. 1,00,000/- per hr in addition to tug hire charges as above

 4

Diving services by outside agency.

 

1

License Fee of Rs 1,00,000/- per vessel per day

 

 2.

The external agency should have certificated divers

 

3. 

In case only mooring boat is required for carrying out diving operation on a ship which is alongside, the charges for the same will be Rs.50,000/- per 4 Hours slab.

 

17. MISC SERVICE CHARGES

MISC CHARGES

 SECURITY 

 Rs. 2300/- 

 Per calendar day/per guard 

 GARBAGE 

(Request to be made prior 24 hrs & collection in day time only)

 Rs. 1200/- 

 Per collection/trip 

 GANGWAY (Request to be made prior berthing).

 Rs. 4500/- 

 Per calendar day 

 Gangway extension ladder at west basin  Rs.1000/-  Per Calendar day

 HYDRA

 Rs. 8000/- 

 Per 4 hour slab (minimum) 

 SHIP CHANDLING 

 Rs. 5000/- + S.t

 Per shipping bill 

 Insuance of duplicate registration certificate  Rs.500/-  Per certificate

 FRESH WATER 

(Request to be made prior 24 hrs). Qty as determined by the port will be final)

MPT - Rs.250/-

West Basin- Rs.350/-

 

 

 

 Per MT

[Qty supplied by Port will be Final]

 

 

 

 

 MARINE ENTRY PASS (Annual) 

 Rs. 300/- 

 Per Registered personnel per annum 

 MARINE ENTRY PASS (Temporary)

 Rs. 200/- 

 Per person per month for Temporary pass 

 INVOICE REVISE 

 Rs.5,000/- 

 Per cancellation of Invoice 

 VCN Cancellation 

Rs.500/-    

   Per VCN

 HOT-WORK PERMISSION 

 Rs.1,000/- 

 Per 4 hour slab (minimum) 

Penalty on non submission of IGM copy before 24 hours of vessel arrival.

Rs. 1000/-

Per VCN

Penalty on non submission of EGM copy  within 9 days of vessels sailing

  Rs. 1000/-

 Per VCN

Any discrepancy/amendments in IGM/ EGM submitted by the agent against the quantity discharged/loaded.

  Rs. 2000/-

 

Per Amendment

Any queries regarding Final Invoice, are to be informed/initiated within 60 days of final invoice date else charges will be applicable.

  Rs. 1000/-

Per VCN

 

A vessel will not undertake any activity which requires prior permission

& payment of charges to the port. Violation of the above will result in a

penalty which will be twice the charges which are applicable.

 

 

 

18. SPM TERMINAL

PORT DUES  0.17 USD per GRT   
PILOTAGE CHARGES  0.51 USD per GRT   
BERTH HIRE  0.15 USD per GRT per DAY    
PULL BACK TUG CHARGES  RS. 320000/-  PER 8 HRS SHIFT(All FAST TIME TO COMMENCE UNMOORING)
Line Boat Rs 250,000/- per boat per activity Sub to availability of suitable craft
ADDITIONAL TUG CHARGES  RS. 40000/- .  Per hour per tug  

Tug used aft during berthing / unberthing

process will constitute part of Pilotage

charges

 

 

 

.

Any additional tugs used will be

charge extra as per tariff.

 

LAUNCH HIRE CHARGES    (TRANSPORTATION FOR 4 HRS) (PER TRIP)  RS.250000 /-  For maximum 4 hours and Rs.50000/- for every subsequent hour. If used by two different parties then each party to pay the said charges. 
RS.75000/-  In addition to tug hire charges in case the ship's stores are carried in excess of quantity 50 kgs. 
PILOT STAND-BY CHARGES  RS. 4500/- Per Hour. 
OIL POLLUTION CESS  RS 0.50  Per Metric Ton.  
ANCHORAGE CHARGES  0.025 USD   Per GRT / Per Day 

[Applicable for all vessels

staying at anchorage]

NOTE: FOR IOCL CHARTED VESSELS FOLLOWING ARE NOT CHARGEABLE

 i) PULL BACK TUG CHARGES.

 ii) PILOT STANDBY CHARGES.

 iii) OIL POLLUTION CESS. 

 


 

 

 

 

 

19. SHIP TO SHIP TRANSFER OPERATIONS (STS)

 FOR MOTHER 

 VESSEL

 INR 7/- PER GRT   PORT DUES 
 INR 1.20/- PER GRT PER DAY   ANCHORAGE CHARGES 
 INR 17/- PER TON   WHARFAGE& CARGO THROUGHPUT CHARGES  
 INR 50000/- PER TRIP   TUG FOR INWARD CUSTOM CLEARANCE (MAX. 4 HOURS) 
 INR 50000/- PER TRIP 

 TUG FOR OUTWARD CUSTOM CLEARANCE (MAX. 4 

 HOURS) 

 FOR DAUGHTER 

 VESSEL 

 

 

 INR 7/- PER GRT   PORT DUES 
 INR 1.20/- PER GRT PER DAY   ANCHORAGE CHARGES 
 INR 100000/- LUMP SUMP   PILOTAGE CHARGES 
 INR 50000/- PER TRIP   TUG FOR INWARD CUSTOM CLEARANCE (MAX. 4 HOURS) 
 INR 50000/- PER TRIP 

 TUG FOR OUTWARD CUSTOM CLEARANCE (MAX. 4 

 HOURS) 

 INR 200000/- LUMP SUMP 

 BERTHING CHARGES (TWO TUGS FOR MAX. 4 HOURS

 EACH) 

 INR 200000/- LUMP SUMP 

 UNBERTHING CHARGES (TWO TUGS FOR MAX. 4 HOURS

 EACH) 

20. TARIFF FOR EQUIPMENT /GEAR HIRING

SR NO. EQUIPMENT RATE Slab charges (minimum chargeable - one slab - 4 hrs)
1
FORKLIFT  32 MT SWL RS. 12500/- 04 HRS 
2
FORKLIFT SHIFTING BY SHORE CRANE
(jetty to hatch - one shifting)
(Hatch to jetty - one shifting)
(One Hatch to another hatch - two shifting)
RS.3500/- EVERY SHIFTING Per activity. 
3
" C" HOOK, 30 MT SWL RS.1000/- 04 HRS 
4
SHORE POWER SUPPLY RS. 50/- PER UNIT/PER HRS 
5
EXCAVATOR EX - 200/210 RS. 9500/- 04 HRS 
6
Weigh Bridge Charges Rs 80/-  Per vehicle
7
Pay loader HM 2021 Rs 1300/- Per hour
8
Ex-200 Rs.1700/- Per hour
9
CAT Loader Rs.3000/- Per hour
10
Equipment deployment for cargo collection on jetty. ( Applicable basis deployment of shore crane for vessel carrying cargo over 20,000 Mt) Rs.11/- Per MT

 

Above equipments will be provided as per availability

21. TARIFF FOR HANDLING BULK CARGO WITH SHORE CRANES FITTED WITH GRABS OF 27 TO 32 CBM FOR WHEAT

 

1 Crane hire :

RS. 68.00 per Metric Ton + Applicable Service Tax.

 [Shore crane will be provided as per availability]

2 Grab hire : RS. 115.00 per Metric Ton + Applicable Service Tax

22. TARIFF FOR HANDLING BULK CARGO OTHER THAN WHEAT

1 Crane + Grab Hire

Rs. 25.00 per Metric Ton + Applicable Service Tax

  [shore crane will be provided as per availability]

23. TARIFF FOR HANDLING BREAK BULK / PROJECT CARGO

1

Shore Crane Hire:

[shore crane will be provided as per availability]

 

12000/Hr

 

2

Crane Hire charges applicable from 01st June, 2010 for break bulk & project cargo

will be with minimum charge of 2 hours & above that on hourly basis.

24. TARIFF FOR QC & MISC SERVICES PROVIDED AT MICT & AMCT CONTAINER TERMINAL FOR HANDLING STEEL PIPES, PLATES, COILS & PROJECT CARGO

1

AMCT QC Charges:

As mentioned in point no 1.25 of port tariff

 

2

MICT QC Charges

Rs. 70000/- per Hr

3

MICT Gangway Charges

Usd $ 100/- per calendar day

 

4

MICT Shore Power Charges

Rs 500/- per unit / per hrs

Note: Non Container Vessels which are berthed at MICT or AMCT Container terminal will have to pay shifting charges if required to vacate the berth for scheduled container vessel.

 

25. STEVEDORING CHARGES ON STEEL CARGO (PIPE, COIL & PLATE) (Import / Export)**

1

Steel Plates / Slab

( For > 32 MT, Rs. 10 / PMT additional)

Rs. 120/ MT

2

Steel Coils ( HR / CR)
( For > 32 MT, Rs. 10 / PMT additional)

Rs. 100/ MT

3

Steel Pipes equals & below 20 inches OD (Applicable for vessel qty > 3000 FRT)
( For vessel qty < 3000 FRT, all lashing & Dunnage material at actual additionally)

Rs. 175/ FRT

4

Steel Pipes equal & below 56 inches OD & above 20 inches od
(Applicable for vessel qty > 4000 FRT)
(For vessel qty < 4000 FRT, all lashing & Dunnage material at actual additionally)

Rs. 110/ FRT

5 Steel Pipes above 56 inches up to 70 inches.
( All Dunnage & lashing material at actual additionally )
Rs. 130/ FRT
6 CWC / Cement coated Pipes
(Applicable for vessel qty > 1500 FRT)
(For vessel qty < 1500 FRT, all lashing & Dunnage material at actual additionally)
Rs. 275 / FRT

** For stevedoring export of coils / plates / slab, dunnage & lashing material will be at actual

** Stevedoring rates are basis handling of Steel Pipes up to a maximum 70” OD for pipe
length of 13.5 Meter.

 

The scope for point 3 and 4 will include following.

(a)

Dunnage (4” x 4”) on tank top load bearing strips maximum 06 nos [at a distance of 2mtrs] and for chocking/shoring and ship sides per pipe stake inside vessel hold.

(b)

2 lines Lashing/securing with 16mm galvanized wire ropes and compatible wire clips and turns buckle per pipe stake inside vessel hold.

(c)

Rubber strip protection on tank top and ship’s sides.

(d)

Lifting gears/spreaders/slings/ specialized pipe lifting hooks.

(e) Above schedule of rates are applicable only for loading/stowage /securing of steel pipes inside vessel holds. In case of any ON DECK/HATCH TOP stowage/ securing, the same would be additional & ascertained on case to case basis as the situation demands. The rates/costs will be calculated on the basis of actual requirement indicated by Master/Chief officer/Port Captain where there are special requirements like fabrication/fitting of Stanchions, pad eyes, stoppers, heavy lashing/ securing materials, wooden wedges etc.
(f) Any additional Dunnage line with rubber padding required to create flat top line for balance between two different pipes in each stake will be on additional basis as combination of charges for additional Dunnage line & rubber respectively.
(g) Max Dunnage for shipment of above scope will be 100 CBM. Any Additional Dunnage used more than 100 CBM due to choking or any other reason will be on chargeable basis on actual.

(h)

All taxes as applicable will be extra and subject to change from time to time as per Govt. circular / guidelines

 

Schedule charges for Additional Services

1

Pine Wood : Rs. 16,500 / CBM

2
Dunnage Wood : Rs. 11,500 / CBM
3
Additional Dunnage Line : Rs. 6000 / Line ( Normal)
4
Additional Rubber Line : Rs. 600 / Line
5
Additional Lashing wire : Rs. 190 / Meter
6
Fumigation charges : Rs. 10,000 per shipment per customer
7
Phytosanitary Certificate : Rs. 5,000 per shipment per customer

26. PROJECT CARGO STEVEDORING RATES

   
1. Up to 25 Freight Tons INR 250 per Freight Ton
2. Over 25 & upto & inclusive 40 Freight Tons INR 350 per Freight Ton
3. Over 40 & upto & inclusive 100 Freight Tons Or over 15 meter INR 650 per Freight Ton
4. For Windmill Parts (As Specified in BL/ relevant custom document INR 250 Per Freight Ton

In case of export movement, Dunnage, Choking and lashing material cost shall be charged extra at actual if required.
A) In case of any cargo restow is required during cargo operations, the stevedoring charges will be applicable as per port tariff, for applicable commodity on restow qty only If same carried out onboard without using transport /storage facility on wharf.
B) In case of any cargo restow is required during cargo operation with storage at wharf (without any transportation) & reloading with crane, single side stevedoring as per port tariff will be applicable for respective commodity on restow qty.
C) In case of any cargo restow is required during cargo operation with storage at wharf & transportation for reloading , stevedoring as per port tariff ( Applicable for unloading & reloading ) will be applicable for respective commodity & in an addition to same, transportation charges/royalty will be applicable on case to case basis.
(D) In case of movement like roll on roll off or direct offloading to another vessel, stevedoring charges will be applicable as per port tariff.

Crane Hire Charges applicable from 1st June, 2010: Rs.12,000/- per hour, with minimum charges of 2 hrs and above that on hourly basis.

 

27. PENAL BERTH HIRE

Rs. 45,000/- per Hour   Applicable when Vessel is unable to commence cargo operations  within 2 hrs of All fast time.
Applicable when vessel is not ready to sail (i.e. Fail to book      outward pilot memo) after 2 hours from the time of completion of cargo. 
Applicable for all vessels if any stoppage is more than 2 hours due failure of vessel equipment, idling at berth or for any other reason. 

28. FIRE FIGHTING ASSISTANCE TARIFF

Sl. No.

Service provided

Duration

Charges

1

Fire Fighting at anchorage/offshore through port tugs in case of emergency

Per one hour

Rs 2,50,000/-

2

Use of foam tender or water tender for fire call, spraying water and supplying water

Per one hour

Rs. 6000/- per hour and part thereof.

3

Foam tender or water tender standby with crew.

Eight hour shift

Rs. 10,000/-  per shift & part thereof

4

Fire crew standby (during hot work, hazardous cargo handling etc.)

Eight hour shift

Rs. 8,000/- per shift   & part thereof

5

Supplying water with pressure by using fire pump at liquid terminal and dry cargo area (Including the charge of water).

Per hour

Rs.  10,000/-  per hour & part thereof

6

Supplying sea water with pressure using fire pumps at jetty.

Per hour

Rs. 2000/- per hour and part thereof

7

Fire operator standby

Eight hour shift

Rs. 1,000/- per shift and part thereof

8

Providing equipments like delivery hose, branch etc.

Eight hour shift

Rs. 200/- per equipment

9.1

Uses of Foam concentrate (AFFF or Alcohol Resistant Foam).

One litre

Rs. 200/- per litre

9.2

Providing fire extinguisher to tank lorries for entering inside liquid terminal (one 10 kg DCP extinguisher)

For single entry

Rs. 50/-

9.3

Providing spark arrestor

Single entry

Rs. 50/-

9.4

Providing fire extinguisher for hot work (for one 10 kg DCP extinguisher)

Eight hour shift

Rs. 200/- per shift

9.5

Providing fire extinguisher for hot work.

For one day (three shift)

Rs. 500/- per extinguisher

9.6

Providing fire extinguisher for hot work.

Three days

Rs. 1,000/- per              extinguisher

9.7

Providing fire extinguisher for hot work.

One month

Rs. 4,000 /- per             extinguisher

10

Providing gas detector for checking of oxygen or combustible gas

For Three point (max)

Rs. 500/- per hour

11

Providing portable fire pump for standby, fire fighting and dewatering operation.

Per hour

Rs. 1,000/- per hour and part thereof

12

Providing Smoke exhauster unit

Per hour

Rs. 1,000/- per hour and part thereof

13

Providing SCBA set

One time use per set

Rs. 1,000/-

14

Imparting training (for outside agency) - maximum 4 hour limited to 20 persons

Per session

Rs. 5,000/-

29. DUMB BARGE

Rs. 112500 per Activity  In addition to port dues and pilotage charges. 
Activity includes berthing and un-berthing .
Any Tug used for Berthing/ Un berthing will be chargeable as per Port Tariff.
Pilotage will start only when the barge is secured as a hip tow to the towing tug
If LOA is more than 70 mtrs and beam more than 25 mtrs, then acceptance will be on case by case basis. 
Rs. 4000/- per 24 hours / line 

All barges must have a minimum of 6 mooring lines of adequate length i.e minimum length of 60 mtrs before they are accepted for berthing alongside. In the event that adequate number of mooring lines are not available, the same can be provided by the port on chargeable basis. Agent must intimate the requirement of ropes at least 24 hrs prior arrival of the tug & barge.

30. Calculation of Penal Berth hire due crane failure for the vessels berthed at Mundra Port

1.

Idling of vessel on account of following :

  • Miss-declaration of cargo as prescribed in clause 6.15: If vessels crane are unable to discharge the said cargo, Penal Berth Hire will be applicable from the time of idling due to said package till the time, vessels request for the shore crane.
  • Mis-declaration of vessels gear/capacity as prescribed in clause 6.15: Penal Birth hire charge will be applicable till the time, vessels request for the shore crane.

 

 

2

Non-Commencement of cargo operation within 2 hours of all fast time: In case the vessel requires to undergo any preloading surveys, allowance of additional 01 hour  will be provided in such cases subject to advance intimation at the time of declaration  & written confirmation from the POC.

a. Cargo operation to commence on 1st hook / hatch within 2 hours of all fast     time.(03 hours in case of permitted preloading survey).

b.  Cargo  operation to commence on all hooks / hatches within  04 hours of  all fast time.(05 hours in case of permitted preloading survey).

 

3

Total idling of vessel's cranes exceeding 10% of total available crane hours / day will attract penal berth hire. However, vessel / vessel agent can request for  Shore crane. In case of unavailability of shore crane, the penal charges would not be applicable.

 

4

This intermediate penal berth hire will be charged Rs.12000/hr/hook as calculated  below:

 

5

Example A:

* Vessel: x with cargo gear 4 x 25 MT SWL crane.

 

> Supposing the crane stoppages in 24 hrs are as follows

  • Crane 1 total stoppage 6 hrs and 30 minutes, (allow 2.4 hrs) = 4.1 Hrs
  • Crane 2 total stoppage 1 hr, (allow 2.4 hrs) = Nil
  • Crane 3 total stoppage 4 hrs and (allow 2.4 hrs) = 1.6 hrs
  • Crane 4 total stoppage Nil. (allow 2.4 hrs) = Nil
  • Then, Total penal berth hire charges hrs = 4.1 +0 + 1.6 + 0 = 5.7 hrs = 6 hrs
  • Total amount applicable for Penal berth hire = 6 hrs x 12,000 = Rs. 72,000/- + applicable service tax.

Housekeeping of storage area: All basic housekeeping required to be done by occupier of all the storage area given on rent for long term basis.  

 

31. STEEL CARGO HANDLING DIMENSIONS / WEIGHT

S. NO  

COMMODITY  

SIZE

SIZE

SIZE

SIZE

MAX. WEIGHT IN MT  

LENGTH

WIDTH

HEIGHT

THICKNESS

1

STEEL COILS

 

1.8 Mtr

1.8 Mtr

 

32 Mt

2

STEEL PLATES / BUNDLE

12.5 Mtr

4 MTR

 

25.00 MM

24 Mt

3

STEEL SLABS

7.0 Mtr

2.0 MTR

 

 

32 Mt

4

STEEL BARS

12.5 Mtr

IN BUNDLES

10 Mt

5

PROJECT CARGO

15 Mtr

3.5 MTR

3.5 MTR

 

30 Mt

6

STEEL PIPES

 

 

 

 

 

 

2 OD - 14 OD (Inches)

13.5 Mtr

IN BUNDLES ( More than 2 pipes)

2Mt -10 Mt

 

14 OD - 70 OD (Inches)

13.5 Mtr

Single pipe

10 Mt

 

NOTE

 

 

MPSEZ will allow direct delivery/carting of project cargo exceeding above dimension. In case same is desired to be handled by MPSEZ, same is to be discussed with port   marketing team on case to case basis.

Other than above mentioned standard dimension for steel cargo, rates can be      obtained from  marketing desk.

32. WATERFRONT ROYALITY (Payable on cargo loaded or shipped through Mundra Port)

Sr.No.

Commodity

Unit per

Rate in Rs.

A.

CHEMICALS

 

 

1.

Solids

 

 

 

Salt other than vacuum and edible

M. Ton

20/- 

 

Salts vacuum and edible including iodised, gypsum

M. Ton

15/- 

 

Soda ash, Caustic Soda

M. Ton

20/- 

 

Salt and gypsum (Unprocessed)

M. Ton

10/- 

 

All other solid chemicals other than petroleum derivatives

M. Ton

45/- 

2.

Liquids

 

 

 

Ammonia, Phosphoric Acid, Ethylene

M. Ton

120/- 

 

All other liquid chemicals other than petroleum deriv.

M. Ton

50/- 

3.

Fertilisers and Fertiliser raw materials

M. Ton

35/- 

B.

AGRI PRODUCTS  

 

 

1.

Food grains and pulses

M. Ton

35/- 

2.

Seeds, Vegetable Oil (bulk)

M. Ton

35/- 

3.

Fruits, Betel nuts, Vegetables

50  Kgs.

10/- 

4.

Molasses, Sugar, Onions, Guar Gum, Coconuts, others

M. Ton

20/- 

5.

Oil cakes, de-oiled extractions

M. Ton

20/- 

C.

IRON, STEEL, MACHINERY

 

  

1.

Scrap - shredded - steel, metal, iron

M. Ton

55/- 

2.

Scrap - HMS, others

M. Ton

75/- 

3.

Sponge iron, HB iron, HR/CR coils, pig iron, iron slabs

M. Ton

60/- 

4.

Steel pipes, cement coated pipes

FRT

25/- 

5.

Machinery and parts

FRT

75/- 

D.

MINERALS AND ORES

 

  

1.

Bauxite, Bentonite, Iron ore in bulk

M. Ton

25/- 

2.

Calcinated Bauxite, Coal, Coke, Charcoal, Firewood

M. Ton

30/- 

3.

Lignite, Lime stone

M. Ton

20/- 

4.

Flourspar

M. Ton

35/- 

E.
BAGGED CARGO    
  Rice/Sugar/Soyabean meal (SBM) M. Ton
50/-
  Cement / Bentonite. M. Ton
50/-

F.

PETROLEUM & PETROLEUM DERIVATIVES

 

  

1.

Crude Oil

M. Ton

17/- 

2.

Asphalt, Bitumen and Coal tar

M. Ton

50/- 

3.

Lubricating Oil (fuel oil), Propylene, Paraxelene,EDC

M. Ton

60/- 

4.

HSD, Kerosene, Naphtha, Petrol, LDO, Furnace Oil

M. Ton

70/- 

5.

LPG, LNG, Butane

M. Ton

110/- 

G.

OTHER COMMODITIES

 

 

1.

Cement, Clinker

M. Ton

50/- 

2.

Wood and Timber including logs

M. Ton/CBM

50/- 

3.

All non hazardous solid cargo not listed in above          categories

M. Ton

50/- 

4.

All non hazardous liquid cargo not listed in above       categories

M. Ton

60/- 


Terms of Use   Sitemap   Contact Us
Best viewed at 1024x768 Resolution on Windows IE 5.5 and above © Mundra Port | Site Developed and Maintained by G2